Se aprobă încheierea Acordului de parteneriat între UAT ORAȘUL SIRET (Beneficiar Principal), AGENȚIA DE DEZVOLTARE REGIONALĂ SVIDNIK (Beneficiar 1), CONSILIUL LOCAL CERNĂUȚI (Beneficiar 2), CAMERA DE COMERȚ ȘI INDUSTRIE…
Ce se aprobă
Se aprobă încheierea Acordului de parteneriat între UAT ORAŞUL SIRET (Beneficiar Principal), AGENŢIA DE DEZVOLTARE REGIONALĂ SVIDNIK (Beneficiar 1), CONSILIUL LOCAL CERNĂUŢI (Beneficiar 2), CAMERA DE COMERȚ ȘI INDUSTRIE SUCEAVA (Beneficiar 3), în vederea promovării proiectului "CARPATHIA UNESCO - GREEN CARPATHIA Integrated cross-border touristic route”, număr HUSKROUA/1702/3.1/0092, cu finanțare din Programul Operaţional Comun Ungaria-Slovacia-România-Ucraina 2014-2020, conform anexei, care face parte integrantă din prezenta hotărâre
Citat din articolul 1 al hotărârii.
Denumire
Hotărârea nr. 49 din 2019 a Consiliului Local Grănicești
ROMÂNIA
JUDEŢUL SUCEAVA
ORAŞUL SIRET
CONSILIUL LOCAL
HOTĂRÂRE
privind aprobarea Acordului de parteneriat încheiat între UAT ORAȘUL SIRET
(Beneficiar Principal), AGENȚIA DE DEZVOLTARE REGIONALĂ SVIDNIK (Beneficiar 1),
CONSILIUL LOCAL CERNĂUȚI (Beneficiar 2), CAMERA DE COMERȚ ȘI INDUSTRIE
SUCEAVA (Beneficiar 3), în vederea promovării proiectului "CARPATHIA UNESCO — GREEN
CARPATHIA Integrated cross-border touristic route”, număr HUSKROU A/1702/3.1/0092, cu
finanţare din Programul Operaţional Comun Ungaria-Slovacia-România-Ucraina 2014-2020
Consiliul local al oraşului Siret;
Având în vedere:
e expunerea de motive nr. 2739 din 25.03.2019 a domnului Adrian Popoiu,
primarul oraşului Siret;
e Raportul nr. 3120 din 04.04.2019 al Serviciului urbanism şi amenajarea teritoriului
şi al Direcţiei buget-prognoze, impozite şi taxe;
e Raportul nr. 3559/18.04.2019 al Comisiei pentru amenajarea teritoriului şi
urbanism, agricultură, realizarea lucrărilor publice, protecţia mediului, conservarea
monumentelor istorice şi de arhitectură, Comisiei pentru administraţie publică
locală, juridică, apărarea ordinii publice, respectarea drepturilor şi libertăţilor
cetăţenilor, învățământ, sănătate, cultură, protecţie socială, activitate sportivă şi
agrement şi al Comisiei pentru programe de dezvoltare economico-sociale, buget-
finanţe, administrarea domeniului public şi privat, servicii de comerţ;
e Ghidul solicitantului - Condiţii specifice de accesare a fondurilor în cadrul
apelului de proiecte cu nr. HUSKROUA/1702 din cadrul Hungary-Slovakia-
Romania-Ukraine ENI CBC Programme 2014-2020 aprobat prin EC decision No
C(2015) 9180;
În temeiul art. 36 alin. (2) lit. €), alin. (7) lit. a), si art. 45 alin. (2) lit. £) din Legea
administraţiei publice locale nr. 215/2001, republicată, cu modificările şi completările
ulterioare,
HOTĂRĂȘTE
Art. 1. Se aprobă încheierea Acordului de parteneriat între UAT ORAŞUL SIRET
(Beneficiar Principal), AGENŢIA DE DEZVOLTARE REGIONALĂ SVIDNIK
(Beneficiar 1), CONSILIUL LOCAL CERNĂUŢI (Beneficiar 2), CAMERA DE
COMERȚ ȘI INDUSTRIE SUCEAVA (Beneficiar 3), în vederea promovării proiectului
"CARPATHIA UNESCO - GREEN CARPATHIA Integrated cross-border touristic
route”, număr HUSKROUA/1702/3.1/0092, cu finanțare din Programul Operaţional
Comun Ungaria-Slovacia-România-Ucraina 2014-2020, conform anexei, care face parte
integrantă din prezenta hotărâre.
Art. 2. Se împuterniceşte domnul Adrian Popoiu, primarul oraşului Siret ca în
numele şi pentru U.A.T. Oraşul Siret să semneze Acordul de parteneriat.
Art. 3. Se împuterniceşte domnul Adrian Popoiu, Primarul Oraşului Siret, să
semneze, în numele parteneriatului, toate documentele necesare şi contractul de finanţare
2
pentru proiectul "CARPATHIA UNESCO — GREEN CARPATHIA Integrated cross-
border touristic route”, număr HUSKROUA/1702/3.1/0092.
Art. 4. Primarul oraşului Siret, prin Serviciul urbanism şi amenajarea teritoriului şi
Direcţia buget-prognoze, impozite şi taxe, aduce la îndeplinire prevederile prezentei
hotărâri.
Vizat control financiar preventiv Contraseninează
Secretaru/'Orașului Siret
Siret, 23.04.2019
Nr._U$
ANEXĂ ZA HEL NA DN 23.0 10/a
Partnership Agreement
(ref: HUSKROUA/1702)
Project title: CARPATHIA UNESCO — GREEN CARPATHIA Integrated
cross-border touristic route
Application ID: HUSKROUA/1702/8.1/0092
HUSKROUA ENI CBC Programme 2014-2020
Preamble
Having regard to
+ Commission Implementing Decision of 8 October 2014 adopting a
programming document for European Union support to ENI Cross-
Border Cooperation for the period 2014-2020 (Programming
Document);
+ Regulation (EU) No 232/2014 of the European Parliament and of the
Council of 11 March 2014 establishing a European Neighbourhood
Instrument (ENI Regulation);
+ Regulation (EU) No 236/2014 of the European Parliament and of the
Council of 11 March 2014 laying down common rules and procedures
for the implementation of the Union's instruments for financing external
action (ENI CIR);
* Commission Implementing Regulation (EU) No 897/2014 of 18 August
2014 laying down specific provisions for the implementation of cross-
border cooperation programmes financed under Regulation (EU) No
232/2014 of the European Parliament and the Council establishing a
European Neighbourhood Instrument (hereinafter referred to as ENI
CBC Implementing Rules);
+ Regulation (EU) No 966/2012 of the European Parliament and of the
Council of 25 October 2012 on the financial rules applicable to the
general budget of the Union and repealing Council Regulation (EC,
Euratom) No 1605/2002;
+ Commission Delegated Regulation (EU) No 1268/2012 of 29 October
2012 on the rules of application of Regulation (EU, Euratom) No
966/2012 of the European Parliament and of the Council on the
financial rules applicable to the general budget of the Union;
+ Joint Operational Programme 2014-2020 of Hungary-Slovakia-
Romania-Ukraine for the ENI Cross-Border Cooperation;
+ National rules applicable to the Lead Beneficiary and Beneficiaries;
+ State Aid applicable rules;
« Guidelines for Applicants;
« Grant contract;
+ Project Implementation Manual of the Programme;
* Project Communication Guidelines.
the following agreement has been concluded between:
SIRET TOWN, (Lead Beneficiary)
Suceava County 28 Noiembrie 1
725500
Romania
and
REGIONAL DEVELOPMENT AGENCY SVIDNIK, (Beneficiary 1),
Slovakia
Presovsky samospâvny kraj
Svidnik 08901 MUDr. Pribulu 1
CHERNIVTSI CITY COUNCIL, (Beneficiary 2),
Ukraine Chernivtsi
Chernivtsi 58002 Central Square 1
CHAMBER OF COMMERCE AND INDUSTRY SUCEAVA, (Beneficiary 3),
Romania Suceava
Suceava 720225 Universitatii 15-17
(Hereinafter jointy referred to as Parties)
have agreed as follows:
1. Subject of the Agreement
The purpose of this Partnership Agreement (hereinafter “the Agreement”) is to
define the rules of procedure for the joint implementation of the project:
CARPATHIA UNESCO - GREEN CARPATHIA Integrated cross-border
touristic route, Registration number HUSKROUA/1702/3.1/0092 (“the
Project”) approved by the Joint Monitoring Committee (hereinafter referred to
as JMC) of the Joint Operational Programme Hungary-Slovakia-Romania-
Ukraine European Neighbourhood Instrument Cross-border Cooperation
Programme on 12 of July 2018 and the relations among the Lead
Beneficiary and Beneficiaries.
The Parties, through the present Partnership Agreement, lay down the rules
of procedures for the work to be carried out and the relations that shall govern
the partnership set up in order to successfully, effectively and efficiently
implement the above-mentioned cross-border cooperation Project. This
Agreement shall also define their mutual responsibilities concerning the
administrative and financial management of the Project.
The Grant Application Form as approved by the Joint Monitoring Committee
and the Grant Contract (with all its provisions) signed by all signatories are to
be regarded as integral parts of this Agreement, therefore their content and
the obligations set by the above-mentioned documents have to be fully
respected by the Parties and the provisions related to the Lead Beneficiary
apply mutatis mutandis to the partners, with the exceptions of the ones linked
to the application of Lead Partner principle.
2. Definitions
Where in this Agreement the “MA” is mentioned this refers to the Prime
Minister's Office, which shall sign the Grant Contract with the Lead
Beneficiary and shall provide the grant funding. The MA is not a party to this
Agreement.
Where in this Agreement the “JTS” is mentioned it refers to the Joint
Technical Secretariat of the Hungary-Slovakia-Romania-Ukraine European
Neighbourhood Instrument Cross-border Cooperation Programme. The JTS is
not a party to this Agreement.
Lead Beneficiary: the Lead Beneficiary is designated by the Project
Participants and has full financial and administrative (co-ordination of the
project activities) responsibility for the Union contribution for the entire
duration of the Grant Contract. The Lead Beneficiary is also responsible for
the proper reporting of progress during project implementation to the Joint
Technical Secretariat as stipulated in the Grant Contract.
Beneficiary: an actor that commits itself to functionally and financially
implement a project part of the Project according to the Grant Application
Form as approved by the Joint Monitoring Committee.
Project Participants: means Lead Beneficiary and other
Beneficiary/Beneficiaries together.
Project part: covers a set of activities within the Project as a whole,
undertaken by the Lead Beneficiary or another Beneficiary in a defined
timeframe and presented as a Lead Beneficiary / Beneficiary budget sheet in
the budget of the Grant Application Form.
3. Obligations of the Parties
The Project Participants commit themselves in doing everything in their power
to foster the implementation of the Project and shall ensure their performance
in time and in compliance with obligations to the JMA. Furthermore, they shall
implement the Project with the requisite care, transparency and diligence, in
line with the principles of sound financial management and with the best
practices in the field.
Project Participants shall actively cooperate in the development and
implementation of the Project. In addition, they shall cooperate in the staffing
and financing of the Project. The Lead Beneficiary and each Beneficiary shall
be legally and financially responsible for the activities that it is implementing
and for the share of the Union funds and, if relevant, the related State
contribution it has received for its project part. The Lead Beneficiary shall
assume the sole responsibility for the entire Projects towards the MA and fulfil
all obligations arising from the Grant Contract of the approved project and is
entitled to represent all Project Participants involved in the project towards
MA/JTS/programme management bodies.
In addition to the obligations set out in the Grant Contract the Lead
Beneficiary is obliged, in particular:
a. to be responsible for the overall coordination, management and
implementation of the entire Project
b. to inform all Beneficiaries on the signature of the Grant Contract
and provide all Beneficiaries with a copy thereof
c. to implement the Project in compliance with requirements set in
the Grant Contract
to appoint a project manager for the overall project coordination
e. to appoint a financial manager in charge of the overall project
financial implementation ensuring a proper book keeping
system, filing the original supporting documents.
f. to appoint a communication manager in charge of the assurance
of the visibility requirements, and the communication and
capitalisation activities
g. to set upa reliable internal control system, coordination system
and audit trail, including mechanisms to avoid double financing
h. to guarantee the legality and regularity of the funds allocated to
the Project, in compliance with all the eligibility criteria
i... to arrange the recovery of amounts unduly paid
j. to ensure that the Beneficiaries receive the total amount of the
Union contribution as quickly as possible and in full in
accordance with the present Agreement
k. to provide the co-financing to the ENI grant according with
Article 3 of the Grant Contract
|. to ensure that the expenditure presented by the Project
Participants has been paid for the purpose of implementing the
Project and corresponds to the activities agreed between the
Project Participants
m. to communicate with the JTS and report to it in time about any
Project complications, changes of the activity or Beneficiaries
and to notify the JTS/MA immediately of any event that could
lead to a temporary or final termination or delay of the project
activity as well as endanger/jeopardise the implementation of
the Project
n. to consult Beneficiaries regulariy, keep them fully informed of
the progress of the Project and about all essential issues
connected to project implementation (e.g. about any variation of
the conditions at the basis of the present Agreement or about
a:
any modification that could influence the implementation of the
Project, the information activity or the payment of financing) and
notify them immediately of any event that could lead to a
temporary or final termination or delay of the project activity as
well as endanger/jeopardise the implementation of the Project
o. to make any effort to contact the Beneficiaries in resolving the
difficulties including seeking the assistance of the JTS/MA
p. to ensure that all Beneficiaries are involved in the decision
making regarding the Project, and especially agree with the
Beneficiaries before submitting any request for reallocation
between budget lines and for any amendment of the Grant
Contract/Partnership Agreement to the JTS/MA
q. to support the Beneficiaries in implementing their obligations by
giving them the correct information, indications and clarifications
on the procedures
r.. to have its expenditures incurred in the given reporting period,
verified by the designated national controller (for Lead
Beneficiary from one of the Member States) or accepted auditor
(for Lead Beneficiary from Ukraine)
s. to collect expenditure verification reports and submit those to
the JTS in due time
t.. to provide help and support for the national controllers or the
auditor in the preparation of the expenditure verification reports
u. to be responsible for the submission of requests for payment to
the JTS
v. to draw up and present the consolidated interim and the
consolidated final reports (hereinafter referred to as Project
Interim Reports and Project Final Report) to the JTS as set in
the Article 6 of the Grant Contract
w. to report in accordance with the existing legislation and national
guidelines if the project activities are State Aid relevant in
accordance with EU legislation for beneficiaries located in the
Member States and in accordance with Chapter 10 of the
Association Agreement between the European Union and
Ukraine for the Ukrainian beneficiaries
x. to properly archive project documents for the period of five years
from the date of payment of the balance of the Programme, as
per Art. 70 of ENI CBC Implementing Rules
y. to implement its individual part of the Project accordingly
z. to enable the responsible bodies indicated in the grant contract
to carry out their audit, control and monitoring / evaluation
activities
aa.to guarantee the systematic collection and the safe storage of all
the documentation regarding project expenditure and activities
bb.to keep a copy of all project documents prepared by the Project
Participants or other bodies.
Each Beneficiary is directly and exclusively responsible to the Lead
Beneficiary for the due implementation of its respective project part and for
the proper fulfilment of its obligations as set out in the Partnership Agreement
and in the Grant Application Form.
In addition to the obligations set out in the Grant Contract each Beneficiary is
obliged, in particular:
a)
b)
c)
d)
9)
h)
))
k)
to implement its Project part in compliance with requirements set
in the Grant Contract
to provide the co-financing to the grant contribution
to appoint a project manager who is responsible for its part of
the project implementation
to appoint a financial manager in charge of ensuring a proper
book keeping system, filing the original invoices, ensuring
adequate measures to avoid double financing etc.
to set up effective, efficient and reliable management and
control system and audit trail at a project Beneficiary level
to ensure that the expenditure has been incurred for the purpose
of implementing the project and correspond to the activities
agreed by the Project Participants and described in the Grant
Application Form
to have its expenditures incurred in the given reporting period,
verified by the designated national controller or auditor and to
submit the expenditure verification report issued by national
controllers (for the Member States) or the auditor (for Ukraine) to
the Lead Beneficiary in due time
without any delay to inform the Lead Beneficiary about any
changes concerning the bank account to which the Union
contribution of the Beneficiary shall be transferred
to provide the help and support for the national controllers or the
auditors in order to prepare the expenditure verification reports
to submit to the Lead Beneficiary the Beneficiary level interim
and final reports
without any delay to provide the Lead Beneficiary with any
information needed to draw up Project interim and final reports
to guarantee the systematic and safe collection of all the
documentation regarding its part of project expenditure and its
transmission to the Lead Beneficiary, as well as to guarantee
the access to documents to all the representatives of the
institutions in charge of verifications and to the bodies
authorised to monitor or audit the Project;
m) to report to the Lead Beneficiary in accordance with the existing
n)
legislation and national guidelines if the project activities are
State Aid relevant in accordance with EU legislation for
beneficiaries located in the Member States and in accordance
with Chapter 10 of the Association Agreement between the
European Union and Ukraine for the Ukrainian beneficiaries
to guarantee the legality and regularity of the funds allocated to
the part of the Project implemented under its own responsibility,
in compliance with all the eligibility criteria
to repay the amounts unduly paid to the Lead Beneficiary, if so
requested by the MA/JTS
p) to react promptly to any request of the Lead Beneficiary or
MA/NTS in particular for what concerns requests related to the
coordination and implementation of the project
q) to notify the Lead Beneficiary immediately of any event that
could lead to a termination or temporary delay of the project
activity as well as endanger/jeopardise the implementation of
the Project
r) to ensure that all information to be provided and requests made
to the MA/NTS are sent via the Lead Beneficiary
s) to properly archive project documents for the period of five
years from the date of payment of the balance of the
Programme, as per Art. 70 of ENI CBC Implementing Rules
The breach of the obligations of the Agreement by one of the Beneficiaries
may lead to an early termination of its participation in the Project. Should a
Project Participant not fulfil its obligations under this Agreement in due time,
the Lead Beneficiary shall admonish the Beneficiary to fulfil them within a
reasonable period of time. The Project Participants undertake to find a rapid
and efficient solution. Should the non-fulfilment continue, the Lead Beneficiary
may decide to terminate the Beneficiary concerned from the Project. This
termination has to be decided by consensus by all the other Beneficiaries in a
documented manner. The Lead Beneficiary shall communicate to the MA/NTS
the reasons for the proposed termination of one of the Beneficiary's
participation and the date on which the termination shall take effect, as well as
a proposal on the reallocation of the tasks of the Beneficiary whose
participation is terminated provided that the eligibility rules of the Call for
Proposal are kept with the remaining Beneficiaries, or on its possible
replacement with the involvement of a new Beneficiary. Such proposal shall
be endorsed by the Joint Monitoring Committee. If the JMC agrees with the
termination and with the proposed changes in the partnership, the Grant
Contract shall be amended accordingly.
4. Duration of Agreement
The Agreement is valid from the date of signature by all Parties and enters
into force from the day the Grant Contract between the MA and the Lead
Beneficiary enters into force. It shall remain in force until the Lead Beneficiary
has discharged in full its obligations arising from the Grant Contract towards
the MA, including the period o
[...]
Text extras automat din documentul oficial; în caz de diferențe, documentul original prevalează.
Primești un email când consiliul local discută sau votează pe subiectul ales de tine — parcări, gunoi, cartierul tău, orice. Gratuit, te dezabonezi oricând.
Vrei să urmărești un cuvânt în toată țara sau într-un județ întreg?
Alertele naționale →
Politica de utilizare hotarari.ro: textul oficial al hotărârilor este public și poate fi citat liber. Arhiva ca bază de date și munca noastră peste ea (rezumate, teme, puncte pe hartă, legături cu firmele, structura site-ului) nu pot fi extrase automat sau sistematic, folosite pentru a dezvolta, antrena, îmbunătăți sau compara un produs ori serviciu concurent (inclusiv un model AI) și nici copiate și republicate. Drepturile de extragere a textului și a datelor (TDM) sunt rezervate, conform art. 4 din Directiva (UE) 2019/790. Sunt permise: indexarea de către motoarele de căutare; citarea de către asistenții AI a unor fragmente scurte, cu atribuire și link către pagină; folosirea personală și profesională obișnuită. Citare: „hotarari.ro, pe baza datelor publicate de [consiliul local/primărie]”, cu link. Termenii completi: https://hotarari.ro/termeni#utilizare-concurentiala Usage policy of hotarari.ro: the official text of council decisions is public and may be quoted freely. The archive as a database and our work on it (summaries, topics, map points, company links, site structure) may not be extracted automatically or systematically, used to develop, train, improve or benchmark a competing product or service (including an AI model), or copied and republished. Text and data mining rights are reserved under Art. 4 of Directive (EU) 2019/790. Allowed: indexing by search engines; quoting short excerpts by AI assistants, with attribution and a link to the page; ordinary personal and professional use. Cite as: "hotarari.ro, based on data published by [council/town hall]", with a link. Full terms: https://hotarari.ro/termeni#utilizare-concurentiala
Folosim cookie-uri esențiale pentru funcționarea site-ului și, doar cu acordul tău, statistici anonime de trafic (Google Analytics). Detalii în Confidențialitate.